Project overview
Delivered over an 8-week programme, this project involved taking a pre-cleared space within the stadium and delivering a complete workplace solution from initial design through to final furniture installation.
We provided a full design package, including mechanical and electrical design, before managing the fit-out and FFE.
Scope of works
Design and Pre-Construction
– Full design pack including mechanical and electrical design
Fit-Out
– Installation of new ventilation and air conditioning systems
– New suspended grid ceiling
– Lighting throughout, including feature reception lighting
– Full fire detection system
– Formation of two glazed offices with Crittall-style banding
– New window linings and boards
– Staff kitchen with feature tiled splashback
– Small power and data installation throughout
– Feature slatted wall panelling
– New doors
– Bespoke joinery, including planters and reception desk
– Feature champagne bar
– Luxury flooring and full decoration throughout
Furniture, Fixtures and Equipment (FFE)
– Desking and task seating for open office space
– Breakout furniture across reception, podcast area, and kitchen
The result
A fully fitted, ready-to-use workspace delivered in just eight weeks, combining practical working areas with high-impact design features.
Set within a live stadium environment, the space provides a mix of open-plan working, private offices, and breakout areas, all finished to a high standard with views across the pitch.
Book a call with us to find out how we can assist your design, construction, and furniture needs.
Speak to us now on +44 (0) 161 643 3003.
Or contact us via the form on the link below.
Contact Us